Studio Contour — Architect & Interior Designer
Tollygunge

Bathroom Designin Tollygunge

If you are designing a modern bathroom in Tollygunge, you basically want a studio that already knows the area and does not treat bathroom design as a copy-paste job, right, and that is exactly the kind of work we do out of our New Town studio.

OUR APPROACH

Bathroom Design, the way we do it

A bathroom is, to be very honest, the one room most homeowners underestimate at the planning stage and then regret the most once the tiles are set and the plumbing is in the wall. What we do at Studio Contour is sit with the actual dimensions early, because a 5x7 bathroom in a Kolkata flat and a 5x7 bathroom in a standalone house behave completely differently in terms of light, ventilation, and what fittings actually fit without feeling cramped. We work through the wet zone layout, the storage, the fixture spec, and the waterproofing strategy all together, so the final bathroom works as a room rather than just a set of products placed inside a box.

  • 01Wet zone and dry zone planning so your towels and vanity never catch splash
  • 02Fixture selection across Indian and import brands within your actual plumbing layout
  • 03Wall and floor tile coordination for slip resistance, grout width, and visual scale
  • 04Waterproofing specification and contractor coordination before any tile work begins

IN TOLLYGUNGE

Designing in Tollygunge

The homes here

Tollygunge has a genuinely layered housing mix. The older bungalows and converted villa floors have wide rooms, high ceilings, and sometimes original mosaic or Shahabad flooring worth preserving. The cooperative flats from the eighties and nineties tend to have awkward columns and under-ventilated kitchens that need careful space planning. The newer premium towers along the main corridors have standard developer-finish interiors where the bones are fine but everything needs to be personalised, so the brief there is usually about materiality, modularity, and making a 1200 square foot flat feel genuinely considered.

What we plan for

Kolkata humidity is the first conversation we have on every Tollygunge project, because the monsoon here is serious and materials that look good in a showroom can behave very differently after two wet seasons. Daylight is another real variable, since many floors in the older cooperative buildings get limited southern light and we plan the colour palette and surface finishes around that early. Plot setback rules and society NOC requirements in the more established pockets slow timelines, and access for material delivery through the narrower lanes near Tollygunge Club needs advance coordination, right from the procurement stage.

Our studio is in New Town, which is close enough that site visits during a live project are genuinely easy for us, not an expedition. More importantly, we have worked across South Kolkata's housing typologies for over a decade, so we are not learning Tollygunge's building stock on your budget. We understand the local contractor ecosystem, the material suppliers, and the practical constraints of the area, and that local knowledge is basically what keeps a project on time and on brief.

HOW WE WORK

From first call to handover

01.

Site & Specs

Assessment, measurements, technical evaluation

02.

Concept & Sketching

Ideation and layout visuals

03.

Design Development

Finalizing materials, lighting, furniture, and aesthetics

04.

3D Visualization

Immersive previews for total clarity

05.

Cost Proposal

Transparent breakdown of budget and deliverables

06.

Material Sourcing

Selection of high-quality finishes and furniture

07.

Project Supervision

Ensuring the outcome matches the vision

COMMON QUESTIONS

Bathroom Design in Tollygunge

Right, that is usually the first thing we check, because moving a floor drain in a Kolkata flat means going into the slab and coordinating with the floor below. In most cases we design around the existing drain positions, and we tell you upfront if shifting anything is genuinely worth the cost and disruption.

Basically we look at every wall surface, including the space above the door and the recess behind the door swing, and we also look at whether a recessed niche inside the shower wall is possible given your waterproofing. Small bathrooms in Kolkata homes almost always have one or two overlooked storage pockets that a proper layout can open up.

That is actually the more interesting brief for us, to be very honest. We assess what is structurally sound and visually worth keeping, whether that is the mosaic flooring, the ceiling height, or original joinery, and we build the new design around those anchors rather than treating the space as a blank box. It usually saves money and always adds character.

We ask for the society's NOC checklist and any building committee rules right at the start, before we draw anything. Most restrictions are around structural walls, external facade changes, and plumbing relocation, so we design within those boundaries from day one rather than planning something and then having to revise it after approval is refused.

For a standard 2 or 3 BHK flat, the design phase runs roughly four to six weeks and execution typically takes three to four months depending on the scope of civil work and the complexity of the modular elements. Older buildings with more site surprises, uneven floors and ageing wiring and so on, can add a few weeks, and we factor that buffer in honestly when we give you the project timeline.

Planning bathroom design in Tollygunge?

studiocontour.mail@gmail.com
Contact Us