Studio Contour, Architect & Interior Designer
Sarjapur Road, Bangalore

Architect for House Design Along Sarjapur Road, Bangalore

House design on Sarjapur Road, Bangalore, with water storage, rainwater harvesting and backup power planned into custom villas and independent homes.

01

A team on the ground in Bangalore for site visits, measurements and supervision.

02

Architecture, interiors and 3D visualisation from one studio, so the house and its rooms are designed together.

03

330+ buildings delivered since 2014, led by principal architect Sumana Kumar.

Drive out along Sarjapur Road towards Sarjapura and the corridor tells its own story in the order things arrived, with the tech campuses and gated villa communities first, apartment complexes filling in around them, and further out the plotted layouts where independent houses have gone up faster than the roads, drains and pipelines meant to serve them, so anyone starting on house design on Sarjapur Road, Bangalore is really planning a home that has to look after itself for a while before the city catches up with it.

That changes what a good plan looks like on these plots, because the questions that decide whether the house is pleasant to live in go well beyond how many bedrooms fit, and they include where the tanker parks when it comes to fill the sump, how much of the rain on the terrace and driveway can go into the ground instead of onto an unfinished road, which circuits stay live when the supply drops, and how high the plinth should sit when nobody can yet tell you where the finished road level will settle.

Our approach to these houses comes from the way Studio Contour has worked since it was founded in New Town, Kolkata in 2014, with architecture, interior design and 3D visualisation in one studio, 330+ buildings delivered mostly in Kolkata and elsewhere in India, and a recently opened Bangalore branch with its own team, so the site visits, measurements, contractor coordination and supervision for a Sarjapur Road plot are handled locally by people who can actually stand on it.

Planning a Sarjapur Road house for services that arrive late

The first thing we study on a plotted layout further down the corridor is the road in front of the plot, because a road that is still mud or half-laid today will be finished at some level later, and if that level ends up above your gate then every monsoon the runoff from the street finds its way down your driveway, so the plinth height, the slope of the ramp and the position of the gate are basically decisions about where water will go once the road is done, and we make them with a proper site survey in hand rather than by eye.

The design for The Kadamba House, a two-family residence in a gated layout outside Bengaluru, lifts both homes onto a raised plinth and shelters the walls under deep eaves lined in timber, and that same instinct of keeping the living floor clear of water and the walls out of the driving rain matters even more on an open layout, where there may be no finished drainage to fall back on.

Where the underground drainage line has not reached a layout yet, the plan needs room for an interim arrangement inside the plot and a clear route for the connection later, so joining the line does not mean breaking open a finished driveway. Inside a gated villa community some of this can be handled at the community level, but on an independent plot in an open layout the house stands on its own, and that is where self-reliance has to be drawn into the plan from the first sketch rather than bought as equipment after handover, which is the one layer this corridor adds on top of everything else that goes into house design in Bangalore.

Sump, borewell and overhead tank drawn as one water system

Piped Cauvery water does not reach every part of the city evenly, and many areas have relied on borewells and private tankers, which on a plot where the infrastructure is still catching up can be the whole supply, so we treat the water system as a piece of architecture with its own logic rather than something a plumber sorts out at the end.

The sump goes where a tanker can actually reach it, right, which usually means close to the gate with an inlet that needs no hose dragged across the car porch, and its depth is settled only after the soil investigation tells us what lies under the plot. The overhead tank sits over the wet areas wherever the plan allows, so pipe runs stay short and pressure stays even, and the structure below is designed to carry it from the start rather than a tank stand being added later on a terrace that was never meant for one.

The borewell point is kept well away from any soak pit or interim drainage, the pumps get a dry, ventilated spot that can be serviced without walking through a bedroom, and because borewell water quality varies from plot to plot we leave a utility corner for filtration equipment beside the kitchen and laundry, which is far easier on paper than squeezed in after the interiors are done.

i
Build the sump before the walls go up On a plot that runs on tanker water, getting the sump built early lets it store water for the construction itself, and its position is fixed before anything else can get in its way.

Rainwater harvesting that the garden is designed around

Bengaluru gets rain from both the south-west monsoon through the middle of the year and the north-east monsoon later on, so a harvesting system gets two seasons of work every year, and on a plot where the borewell carries the household that recharge is worth designing properly. Rainwater harvesting is mandatory for sites above a certain size and we check where your plot falls under the current rules, but to be very honest we would design it in on almost any independent plot along this corridor anyway, because rainwater harvesting done well is one of the few parts of a house that quietly keeps working for you every monsoon.

The design starts on the terrace, with falls that lead the whole roof to a few well-placed downpipes, a filter and a first-flush arrangement ahead of the storage tank or recharge well, and an overflow that goes somewhere sensible, and then it carries on into the landscape, where the pit, the tank and the paths over them are planned with the lawn, the planting and the car porch so the harvesting becomes part of the garden rather than a concrete lid in the middle of it, which is the whole idea behind Hiding the Harvesting: Integrating Rainwater Tanks Into Landscape and Garden Design.

Backup power for the pumps, the study and the quiet rooms

A water system that runs on pumps is only as reliable as the power behind it, so we split the electrical layout into the circuits that must keep running and the ones that can wait, with the borewell pump, the transfer pump to the overhead tank, the fridge, the router, a few lights and fans in each room and the study on the backup side, and heavier loads like geysers and air conditioning kept off it unless your brief says otherwise.

With tech campuses lining the corridor, a proper home office is often high on the brief, and a study that goes dark halfway through a call is a design failure rather than an inconvenience, so the study gets its own backed-up circuit and good daylight. The inverter and batteries need a dry, ventilated place that is not the back of a wardrobe, a generator, where the brief calls for one, needs a spot where its noise and exhaust travel away from the bedrooms and the neighbours, and we leave conduits and structural allowance on the terrace for solar panels so that adding them later does not fight the overhead tank, the harvesting downpipes or a terrace garden for the same roof.

SystemWhat we settle earlyWhy it matters here
Underground sumpPosition for tanker access and depth after soil investigationTanker and borewell water often come before piped supply
Overhead tankPlacement over wet areas and a structure designed to carry itShort pipe runs and steady pressure
Rainwater harvestingRecharge pit or storage tank within the landscape planBoth monsoons can recharge the ground or fill storage
Backup powerEssential circuits and a ventilated spot for the inverter or generatorPumps and the home office keep running
DrainagePlinth height and a route for a future sewer connectionRoad levels and service lines can change after you build

One studio for the villa, its rooms and the walkthrough

All of this is easier when the people drawing the house are also designing the rooms inside it, because the utility corner with the filtration unit sits beside a modular kitchen we are detailing at the same time, the false ceilings and lighting are laid out knowing where the backed-up circuits run, and the bathrooms, wardrobes and custom furniture are fixed early enough that plumbing and electrical points land where they will actually be used. Our residential architecture and interior design come out of one set of drawings, the same single-studio logic behind Indiranagar House Design: Architecture and Interiors From One Studio, and every scheme is led by our principal architect Sumana Kumar, who sets the design direction for the house as a whole.

Before anything is built you walk through the house in photoreal 3D, so you can see how the tanker inlet looks from the street, whether the car porch still feels generous once the sump lid and harvesting pit are in, how light falls into the study across the day and what the living room looks like in the finishes you have chosen, and a change at that stage means redrawing a line rather than breaking a wall.

Studio ContourA builder's standard plan
Plan drawn for your plot and your familyOne plan repeated across many plots
Water storage and backup power placed from the first sketchServices follow the standard layout
Interiors designed together with the roomsInteriors chosen after handover
You walk through the house in 3D before work startsYou judge from a sample villa or a brochure
A separate contractor builds under our supervisionOne company designs and builds

Vastu on a layout where the road decides your facing

On a plotted layout the facing of your plot has usually been decided by the layout long before you bought it, so we work Vastu into a good plan instead of bending a good plan around it, placing the entrance, kitchen, pooja space and master bedroom where traditional guidance prefers them while keeping every room well lit, ventilated and sensibly connected to the next.

Water storage is where Vastu and self-reliance meet most directly, since traditional guidance tends to favour underground water towards the north-east and the heavier overhead tank towards the south-west, and on some plots that sits comfortably with tanker access from the road while on others it means a longer inlet pipe or a rethink of the car porch, and we would rather show you those trade-offs in the plan than quietly break one rule to satisfy another. If Vastu matters to your family, our Vastu-compliant design treats it as part of the brief from the first sketch, and if it does not, the same plan simply reads as a well-oriented house.

When a standard villa or a design-and-build firm suits you better

The catch here is that hiring an independent architect is not the answer for every Sarjapur Road buyer, and we would rather say so plainly. If you want to buy a finished villa inside a gated community and simply move in, a builder's standard plan gives you that without a single design decision, and if you have a very small budget for a standard house on a regular plot, a freelance draughtsman or a contractor who also draws plans is a simpler route to a drawing set, although you give up the custom plan and the coordinated interiors.

If you want one company to design and build under a single contract, a large design-and-build company is structured for exactly that, whereas we design and supervise and a contractor builds, which gives you independent oversight on site but also means managing two relationships instead of one. We fit best for the owner of an independent or villa plot who wants a house designed for that particular site and family, inside and out, and if your plot is a regular rectangle the planning in 30x40 House Design in Bangalore: Plans, Floors and Interiors Done Properly comes before any of the systems above, while a dense site brings its own trade-offs, the kind we work through in Marathahalli House Design: Making a Dense Site Work Harder.

From site visit to supervision on a Sarjapur Road plot

  1. 01Site visit and survey
  2. 02Concept plans with Vastu and services
  3. 033D walkthrough and design freeze
  4. 04Working drawings and approval documents
  5. 05Construction with site supervision

The approval route depends on where your plot sits, so we confirm the current process for your specific plot before drawings are prepared, then produce the drawings and documents it asks for and guide you through it, while your title documents go to your own lawyer to be checked before the design is finalised.

What keeps a project moving is a clean survey, papers already checked and decisions made at the 3D stage rather than on site, and what slows it down is the opposite, changes after the working drawings are issued, a road level nobody has confirmed, or finishes chosen after the contractor needs them. Because our team is now on the ground in Bangalore, the visits that matter most, from the first survey through the plinth and sump stage, the slab, the services before walls are closed and the finishing, are attended locally, so problems get caught while they are still easy to fix.

  • Ask whether the plot has piped water today or relies on a borewell and tankers
  • Confirm the likely finished road level in front of your gate
  • Check your title documents with your own lawyer
  • Confirm the current approval process for your plot
  • Get the sump and backup power positions shown on the drawings
  • Get the supervision visits included in writing

Bringing your Sarjapur Road plot to the studio

Every brief is quoted individually once we have seen the site and understood the family, so the most useful first step is to send us the plot dimensions, which way it faces, what water and power it has today and what you want the house to do for you, and you can look through the homes and buildings we have designed before you tell us about your plot.

FROM OUR PORTFOLIO

Homes we have designed

The Bangalore branch is new, so alongside the Kadamba House outside Bengaluru these are homes from across our portfolio, each captioned with where it actually is.

COMMON QUESTIONS

Before you start

It is mandatory for sites above a certain size, and we confirm where your plot falls under the current rules at the start, but we recommend it on most independent plots regardless, because a house that leans on a borewell benefits from every monsoon that recharges the ground beneath it, and when the pit or tank is planned with the garden it takes up very little usable space.

Usually near the gate, so a tanker can fill it straight from the road, well away from any soak pit or interim drainage, and at a depth fixed only after the soil investigation. If Vastu matters to you, traditional guidance prefers the north-east for underground water, and the plan shows how that sits against tanker access before anything is set in concrete.

Yes, because we design and supervise while a contractor builds, so a contractor you already trust can work from our drawings and our team in Bangalore coordinates with them on site. We would want them brought in before the working drawings are final, so their methods are reflected in the details, and we keep our supervision visits at the stages where mistakes are hardest to undo.

We do not work from a standard rate, because the effort behind a house depends on the plot, the size and complexity of the brief, how much of the interiors we are designing and how much site supervision you want. Once we have seen the site and understood what your family needs, we quote that brief individually, and the quote sets out exactly what is included.

Planning a home in Sarjapur Road?

Contact Us